Suzhou · China

No more,
no less

Things change; measure does not. Yidu Technology works in software, systems, and technology and management consulting — measure the work first, then build.

A round ice-crack window set in a white Suzhou garden wall A round moon gate in a white garden wall, with a stone sill inside Bamboo growing at the foot of a wall, leaves at the ends of branches
01 / 03
Fig. 1An ice-crack window: broken tiles and bricks set by eye, every seam wherever it falls, no two alike.
OneWho we are

Two characters

Yi is change. Du is measure.

「易」is change. The system a client asks for in spring is not the one they need in winter: requirements grow, interfaces age, people leave. We write every module with its next change in mind.

「度」is proportion. If a product on the shelf fits, we do not write code. If one line can change, we do not rewrite the module. And when a job sits outside what we do well, we say so at the table.

A wide range does not mean everything is done well. So the boundary goes into the contract before the work starts, and anything still uncertain stays on paper until it is not.

Our measure

  • Yi is knowing change. Du is knowing when to stop.
  • Reverence without fear. Principle, then surprise.
TwoWork

What we do

Three lines of work, from a line of code to a working system. The rules are one set.

  1. 01

    Software

    Custom systems, outsourcing and packaged software. We start from a real purchase order and a real process, not from a tidy flow chart.

    For example: orders and settlement, stock and planning, apps and mini-programs, dashboards, integration with outside systems.

  2. 02

    Systems

    Software, network and equipment joined into one thing, from the server room to the production line. It runs, it can be repaired, and it can be handed over.

    For example: information system integration, industrial PCs and equipment links, site network and terminals.

  3. 03

    Technology and management consulting

    We look at what is already there before proposing anything. Technology choices, IT planning, process and management all go on paper and into the contract.

    For example: technology assessment, IT planning, process review, transfer of research into products.

ThreeMethod

How we work

Four steps, in this order. Software, systems and advice all follow them.

  1. 01

    Look

    A day on site, a full shift. Most problems live outside the meeting room.

  2. 02

    Measure

    Turn faster and steadier into numbers two people can compare.

  3. 03

    Build

    Ship in small steps. Every release is usable and can be rolled back.

  4. 04

    Hand over

    Software, systems and documents arrive together, and someone answers the phone after.

易,穷则变,
变则通,通则久。

I Ching · Great Commentary II

The name comes from this line: yi is change, du is measure. Holding measure inside change is the work of engineering.

FourContact

Tell us what is stuck

One email describing where things are stuck is enough to start.

Office
Room 205, Building D, 388 Ruoshui Road, Suzhou Industrial Park, Suzhou, China